|
Holland, Indiana (SW IN) | Getting into a project very flat field
SO 1 Ft in 2000 ft is what I have --longest runs 2500 ft using 4" 30' spacing
1.7 acres per run At 1/2" coefficient 4" will carry it according to my calculator
Check if I'm right please
Thinking about the curvature of the earth
have a laser setup to keep the light I'll set the laser in the center of the run
Will Curvature of the earth (8" per mile) affect the run on the "down slope" ?
I probably worry too much dug up some 4" tile (regular perforations not knife cut) we laid 45 years ago with a Buckeye and laser about 1" of sediment
Any advice appreciated --don't want to screw this up
Thanks Dan
Edited by Dan Loehr 11/8/2024 09:02
(IMG_4203 (full).jpeg)
(IMG_4204 (full).jpeg)
Attachments ---------------- IMG_4203 (full).jpeg (122KB - 6 downloads) IMG_4204 (full).jpeg (150KB - 2 downloads)
| |
|