AgTalk Home
AgTalk Home
Search Forums | Classifieds (78) | Skins | Language
You are logged in as a guest. ( logon | register )

Tiling long runs at .05% check my figures
View previous thread :: View next thread
   Forums List -> Crop TalkMessage format
 
Dan Loehr
Posted 11/10/2024 17:43 (#10961448 - in reply to #10961208)
Subject: RE: Tiling long runs at .05% check my figures


Holland, Indiana (SW IN)
What we use for bubble ups is an 18” N 12 pipe about 6’ long set it vertically usually some concrete mix in the bottom (maxi core)
In coming tile at the bottom out going what ever height the ditch is need an animal guard on the out put a disc blade on top for a lid
End up with the main low enough to plow over it main stays full of water
In this field laterals will probably be mostly dry when ditch is low

A cure for shallow ditches till they silt in then dig the ditch

Dan
Top of the page Bottom of the page


Jump to forum :
Search this forum
Printer friendly version
E-mail a link to this thread

(Delete cookies)