AgTalk Home
AgTalk Home
Search Forums | Classifieds (79) | Skins | Language
You are logged in as a guest. ( logon | register )

Tiling long runs at .05% check my figures
View previous thread :: View next thread
   Forums List -> Crop TalkMessage format
 
Dan Loehr
Posted 11/8/2024 08:58 (#10958062)
Subject: Tiling long runs at .05% check my figures


Holland, Indiana (SW IN)
Getting into a project very flat field
SO 1 Ft in 2000 ft is what I have --longest runs 2500 ft using 4" 30' spacing
1.7 acres per run At 1/2" coefficient 4" will carry it according to my calculator
Check if I'm right please

Thinking about the curvature of the earth
have a laser setup to keep the light I'll set the laser in the center of the run
Will Curvature of the earth (8" per mile) affect the run on the "down slope" ?
I probably worry too much dug up some 4" tile (regular perforations not knife cut) we laid 45 years ago with a Buckeye and laser about 1" of sediment

Any advice appreciated --don't want to screw this up

Thanks Dan

Edited by Dan Loehr 11/8/2024 09:02




(IMG_4203 (full).jpeg)



(IMG_4204 (full).jpeg)



Attachments
----------------
Attachments IMG_4203 (full).jpeg (122KB - 6 downloads)
Attachments IMG_4204 (full).jpeg (150KB - 2 downloads)
Top of the page Bottom of the page


Jump to forum :
Search this forum
Printer friendly version
E-mail a link to this thread

(Delete cookies)